Operator Responsibilities. WerkMaster SPECTRE, Stealth
Annonce
Annonce
!
Operator
Responsibilities
‣
NEVER overfill the engine with oil. Overfilling can cause irreparable damage to the engine.
‣
DO NOT engage starter for more than 5 seconds. Allow a 10 section cool down for second failed start-up attempt.
‣
Perform all recommended scheduled maintenance. Regular maintenance of your propane powered floor machine is necessary to keep it safe working condition.
‣
Before starting machine ensure all safety devices are in place and functioning properly. Before starting machine do a maintenance and safety check. See page .
‣
When using machine, go slowly on inclines and slippery surfaces. Use care when operating machine in reverse.
‣
When servicing machine, stay clear of moving parts. DO NOT wear loose clothing when working on machine. Block machine wheels before raising or jacking up machine. Use hoist stands that will support the weight of the machine. Wear eye and ear protection when using pressurized air or water. Disconnect battery connections before servicing machine. Only use replacement parts supplied by WerkMaster or a WerkMaster Authorized Distributor or Service Center.
DO NOT operate this machine before carefully reading and understanding the operation manual.
The operator is responsible for performing the recommended daily maintenance and checkups of the machine to keep it in good working condition. The operator must inform the service mechanic or supervisor when recommended maintenance procedures are required as described in the MAINTENANCE section of this manual.
We recommend taking advantage of a service contract from your
WerkMaster Authorized Distributor or Service Center. Order parts and supplies only from an Authorized WerkMaster Distributor.
During and after operation, perform the recommended daily and hourly procedures outlined in the Maintenance Chart.
OPERATOR’S MANUAL
8
Download
Annonce